Simon Marks Jewish Primary School

Client

Scopus Trust

Funding

Clore Foundation

Construction Costs

£350,000

A technology and art extension has been added at first floor level by inserting a timber framed and clad box on top of the existing one-storey administration and dining block, and linking this in with other facilities at first floor level. The extension is designed to bring natural light and ventilation into the centre of the school and to allow the new facilities to integrate with the existing in both complementary and contrasting ways.

Completion 2000

32 - 34 clarence mews london e5 8hl T 020 8525 5520 F 020 8525 5530 E contact@cazenove-architects.comW www.cazenove-architects.com